REHABILITATION OF ČAPLJINA PUMP STORAGE HPP
Location: on Trebisnjica river basin in Herzegovina-Neretva
Company: Elektroprivreda HZHB Mostar
Capacity: 420 MW
Year: 2026
Estimated investment: EUR 18.9 million
Type: hydropower plant (HPP)
Status of the project: in action
The project will rehabilitate PSHPP Čapljina’s equipment, ensuring generation and pumping potential for another 15 years of operation. ATB Riva Calzoni was selected as the turbine supplier for the project. The company provided 2 units of Francis turbines, each with a 250-MW nameplate capacity. Anschutz Entertainment Group supplied 2 electric generators for the project. The generator capacity is 240 MVA.
DABAR HPP CONSTRUCTION
Location: Danube river, between Romania and Serbia
Company: Hidroelektrane na Trebišnjici (ERS)
Capacity: 160 MW
Year: 2028
Estimated investment: EUR 222 million
Type: hydropower plant (HPP)
Status of the project: in action
The deadline for construction, which has been entrusted to the Chinese company “Gezuba Group”, is 46 months, and the power system of Republika Srpska should provide new 500-gigawatt-hours of electricity.
WIND FARMS SLOVINJ AND DŽEVA
Location: Glamoč municipalit y
Company: WPD
Capacity: Slovinj of 138 MW,
and Dževa of 46 MW
Year: n/a
Estimated investment: EUR 263.45 million
Type: wind power plant (WPP)
Status of the project: received a concession from the cantonal authorities
HRGUD WIND FARM
Location: Berkovici
Company: Elektroprivreda
Republika Srpska (ERS)
Capacity: 48 MW
Year: 2025
Estimated investment: n/a
Type: wind power plant (WPP)
Status of the project: financing stage
The wind power project consists of 16 turbines, each with a 3-MW nameplate capacity.
SPP ON THE TERRITORY OF STOLAC
Location: Hodovo, near Stolac in the Herzegovina region
Company: Elektroprivreda HZHB Mostar
Capacity: 150 MW
Year: n/a
Estimated investment: EUR 92 million
Type: solar power plant (SPP)
Status of the project: in action
SOLAR POWER PLANT NEVESINJE
Location: next to the main road Nevesinje-Gacko
Company: Etmax (Solarna Elektrana Nevesinje)
Capacity: 500 MW
Year: 2024-2026
Estimated investment: EUR 450 million
Type: solar power plant (SPP)
Status of the project: permitting
Nevesinje Solar PV Park is a groundmounted solar project. The project involves the construction of one 200-MW solar park and six smaller ones of 50 MW each.